Live Production Intelligence

Every mold. Every batch.
Every market.
One screen.

From injection-mold tooling to shrink-wrapped pallets — die-cut schedules, resin batch numbers, and ASTM/EN-71 checklists side by side across every shift.

Download Compliance Checklist →
Mold Control Center — Shift 1 · 06:14:22
All Lines Active
LIVE
Production Schedule — Mold CyclesToday · 3 Shifts
06:0008:0010:0012:0014:0016:00
Mold A-14
72%
Mold B-07
45%
Mold C-22
91%
Mold D-03
28%
Resin Batch
RB-2024-441
RB-2024-442
RB-2024-443
Quality Gate
0.3%Live Defect Rate
Compliance
ASTM F963
Certified
EN-71 Pt.1
Certified
EN-71 Pt.3
Certified
ISO 8124
Pending
Explore
Injection Mold Tooling·Resin Batch Tracking·ASTM F963·EN-71 Compliance·Die-Cut Scheduling·Shift Handoff·Defect Rate Monitoring·Colorant Shipments·ISO 8124·Pallet Manifests·Three-Shift Operations·Supply Chain Visibility·Injection Mold Tooling·Resin Batch Tracking·ASTM F963·EN-71 Compliance·Die-Cut Scheduling·Shift Handoff·Defect Rate Monitoring·Colorant Shipments·ISO 8124·Pallet Manifests·Three-Shift Operations·Supply Chain Visibility·
Interactive Explorer

The mezzanine view.
Every conveyor. Every status light.

Hover any module to expand it. Drag batches, toggle compliance standards, click shipment lanes — this is exactly what your operations team sees at 06:00.

Operations
15Active SKUs

Production Scheduling

Mold cycles · Batch sequencing · Shift handoffs

Drag-and-drop batch resequencing across 3 shifts. Every mold cycle tracked against resin batch numbers with real-time progress.

Drag batches to re-sequence the run order

RB-441Mold A-14Shift 1
RB-442Mold B-07Shift 1
RB-443Mold C-22Shift 2
Compliance
0.3%Defect Rate

Quality Gating

ASTM F963 · EN-71 · ISO 8124

Toggle any certification standard to instantly populate required test checklist. Amber locks surface before deadlines, not after.

Toggle a standard to see required tests

Supply Chain
4Origin Continents

Shipment Tracking

Colorants · Resins · 4 continents

Click any shipment lane to surface carrier ETAs, customs status, and buffer stock levels — all before your line runs dry.

Click a lane to surface carrier ETAs

47
Factories Running Mold
98.7%
On-Time Delivery Rate
3x
Shifts. Zero Blind Spots.
<2min
Min Shift Handoff Time
Quality Gating

Certification deadlines
don't care about your holiday calendar.

Quality managers chasing ASTM F963 and EN-71 before Q4 shipping windows get a live compliance tracker — amber locks surface 60 days before expiry, not the morning of a customs hold.

ASTM F963✓ Certified

US Toy Safety Standard

14
Required Tests
Mechanical HazardsPass
FlammabilityPass
ElectricalPass
Heavy ElementsPass
AcousticsPass
Last Audit
Jan 14, 2026
Next Due
Jul 14, 2026

Download the EN-71 Compliance Checklist

Pre-audit checklist used by quality managers at 47 factories. PDF, updated Jan 2026.

Supply Chain Visibility

Colorants from
four continents.
One manifest.

Supply-chain leads see every inbound shipment — resin, pigment, TiO₂ — with buffer-stock days calculated live so no line runs dry before the holiday push.

🇺🇸
HDPE Natural Resin
Houston, TX, US
⚠ Delayed
Carrier
XPO Logistics
Vessel / Mode
Ground Freight
ETA
Feb 27, 2026
Quantity
8,200 kg
Buffer Stock Remaining7 days

⚠ Buffer below 10-day threshold — consider expedited shipping

🇨🇳
Asia Pacific
12 lanes
🇩🇪
Europe
8 lanes
🇺🇸
Americas
6 lanes
🇮🇳
South Asia
4 lanes
Factory Floor Results

The lines are humming.
Every status light green.

0.3%
Average defect rate across Mold factories
Industry avg: 2.1%
98.7%
On-time delivery to retail distribution
Across 47 facilities
47
Mid-size toy factories running Mold
15+ SKUs, 3-shift operations
<2min
Average shift changeover with Mold dashboard
Was 18 min average
2 minShift handoff time
"We went from 4 spreadsheets and a whiteboard to one screen. Our shift handoff dropped from 18 minutes to under 2. That's recovered time we put back on the line."
Portrait of Marcus Thornton, VP Operations at Hartwell Toy Group
Marcus Thornton
VP Operations · Hartwell Toy Group
58dEarly flag lead time
"The compliance tracker flagged our ISO 8124 renewal 58 days before deadline. We would have caught it at customs. That alone paid for the platform twice over."
Portrait of Priya Chandrasekaran, Quality Assurance Director at BrightEdge Plastics
Priya Chandrasekaran
Quality Assurance Director · BrightEdge Plastics
4Continents, one view
"I manage colorant supply from China, Germany, and India simultaneously. The buffer-stock alert on our HDPE resin saved a production stop during peak season."
Portrait of Dmitri Voloshyn, Supply Chain Lead at Meridian Molds LLC
Dmitri Voloshyn
Supply Chain Lead · Meridian Molds LLC
Injection mold machine operating on factory floor with orange molten plastic
Mold Cycle Monitoring
Quality control technician inspecting toy components under bright factory lighting
Quality Gate Inspection
Warehouse with organized pallet rows and forklift in toy manufacturing facility
Pallet & Shipment Tracking
Get Started

See your factory floor
in 30 minutes.

We'll walk you through a live demo on your production profile — real mold cycles, real compliance standards, real shift structure.

Step 1 of 3 — company name

🔒No commitment
48h response
🏭47 factories trust Mold